Replace old IT without stopping the business

We audit what you run today, write a roadmap with phases and costs, and migrate in small steps that are rehearsed first. Staff come in on Monday and things simply work faster.

First audit
Free
Typical project
2 to 4 weeks
Downtime
Outside office hours

The tools we use

  • Proxmox VE

    Virtualisation

  • Palo Alto / OPNsense

    Firewall

  • HPE / Lenovo

    Server hardware

  • HPE Aruba

    Switching

  • UniFi

    Wi-Fi

  • WireGuard / Cloudflare

    VPN and zero-trust access

Open, well-supported platforms without per-core licence surprises.

The problem

Old infrastructure fails slowly, then all at once

A server bought in 2014 still works, so nobody replaces it. Meanwhile it runs an unsupported operating system, the warranty has expired, the backup takes all night and nobody remembers how the network was set up.

The usual trigger for change is a failure. Then everything is done in a hurry, at the highest price. Planning the replacement a year early costs less and avoids the bad week.

  • Unsupported systems no longer receive security updates
  • Physical servers without spare parts are a single point of failure
  • Unused licences and old contracts often cost more than the hardware
  • Undocumented networks make every change slow and risky

What a modernisation covers

We only replace what needs replacing. Sometimes a configuration fix buys three more good years.

Infrastructure audit

Servers, PCs, network, licences, contracts and cloud spend, listed with age, support status and cost.

Server consolidation

Several old servers onto a Proxmox cluster with ZFS storage and replication. Less hardware, no licence fees for the hypervisor.

Cloud where it makes sense

Mail, files or backups to the cloud when it is cheaper or safer. The ERP stays on site if that is better for you.

Network redesign

Cabling, HPE Aruba switches, UniFi Wi-Fi and VLANs for office, production and guests, with a diagram you can read.

Staff training

Short live sessions on what changes for each person, and a contact for the first weeks.

Documentation

Runbooks, diagrams and passwords delivered at the end. Your IT is documented, not locked in someone's head.

How we work

A migration with no surprises

Every phase is tested before the next begins, with a rollback plan for each step.

  1. 011–2 days

    Free audit

    We map everything you have and its condition. No cost, no obligation.

  2. 021 week

    Roadmap and budget

    Target architecture, phases and costs, sized to your budget. Not a template.

  3. 031 week

    Staging rehearsal

    The migration is rehearsed in an isolated copy before production is touched.

  4. 041–2 weeks

    Phased migration

    Systems move in waves, evenings or weekends, each validated before the next.

  5. 053 months

    30/60/90 day review

    We check performance, costs and security after the move and adjust what needs it.

Manufacturing company

Two ageing servers replaced by a Proxmox cluster

Starting point

A manufacturing company running on two ageing physical servers.

What we did

Both servers consolidated into a Proxmox cluster with ZFS storage, plus offsite backups.

Result

Unplanned downtime fell by 95% compared with the year before, and hardware and licence spend fell by 40%.

95%
Less unplanned downtime
40%
Lower hardware and licence spend
2 → 1
Servers into one cluster

Guide

Planning an IT refresh in a small company

Signs it is time to modernise

One of these on its own is not urgent. Three or more usually are:

  • Servers older than six or seven years, or out of warranty
  • Windows Server 2012/2016 or other systems near or past end of support
  • Backups that take all night, or that nobody has ever restored
  • Wi-Fi complaints, or production and office on the same network
  • Software licences nobody can account for

Proxmox or VMware?

Since Broadcom changed VMware licensing, many small companies are paying far more for the same servers. Proxmox VE is open source, mature and supports clustering, replication and backups out of the box. For most SMB workloads it does everything needed at a fraction of the cost, and you can buy enterprise support if you want it.

Cloud or on premise?

Mail, file sharing and backups are usually cheaper and safer in the cloud. ERPs, CAD files and production systems often run better on site, close to the people using them. The right answer is usually a mix, decided service by service with costs over five years, not by fashion.

FAQ

Questions we get most often

How disruptive is the migration?

We migrate in phases, mostly in the evening or at weekends, with a tested rollback for each step. For most clients the staff notice nothing except that things are faster.

Can you modernise without replacing everything?

Usually yes. The audit tells us what is worth keeping. Sometimes updates and a configuration fix are enough for a few more years.

When do we see savings?

Savings from consolidation and licence clean-up usually show within three to six months. Fewer outages are noticeable from the first month.

Are there grants for IT investments?

Sometimes. National incentives and regional calls have covered hardware and software in recent years. We help you check what is open and prepare the technical documentation.

Do we have to sign a managed contract afterwards?

No. Many clients do, but the project is a project. You get all the documentation and can manage it yourself or with someone else.

Free first call

Tell us what is not working

An engineer replies, not a sales rep, within one working day. The first on-site visit is free too, anywhere in the provinces of Treviso, Padua and Vicenza.

Via Alberon 19/F, 31030 Castello di Godego (TV), Italy

Write to us

We use these details only to answer you. See the privacy policy.